Background:
All engineering designs for tide gate repair or replacement projects must meet local, state, and federal regulatory requirements to construct the project. One of the biggest regulatory influences on tide gate designs is the state and federal fish passage requirements. Design options must meet requirements for fish passage, but the preparation of engineering plans can be challenging and costly. Resources to help reduce the cost of project engineering are needed.
Actions:
A subgroup of Tide Gate Partnership members has worked with an engineering firm, Northwest Hydraulic Consultants (NHC) to develop an engineering tool. It is a model that is intended to serve as a simple tool for both landowners and technical support organizations, who possess the necessary construction knowledge and resources, to properly size and installs a tide gate pipe that fulfills both state and federal fish passage regulations. The tool should also provide both a cost-benefit and time savings for landowners who do not have or cannot secure, the funding necessary for more complex hydraulic modeling.
An instructional video demonstrates how the Tide Gate Pipe Sizing Tool works.